Despite dealing with concrete the cost of mudjacking is much less than most fear.
Polylevel concrete lifting cost.
Many contractors use mudjacking or slab jacking to demolish and replace broken concrete slabs.
Concrete raising is typically about half the cost of replacing the same concrete.
While the cost can certainly vary based on factors mentioned below most homeowners spend between 600 and 900 with the average concrete leveling cost coming in at 825.
During mudjacking workers drill 2 inch to 5 inch holes into the concrete then pump in a mixture known as slurry.
It is a fraction of the cost of breaking up removing and replacing concrete.
Polyurethane foam concrete raising cost the cost of pumping polyurethane foam under a concrete surface or polyjacking ranges from 5 to 25 per square foot.
Concrete leveling costs 25 to 50 less than concrete replacement and lasts 5 to 10 years.
Contractors can adjust the chemical reaction that causes the foam to expand and control how much the concrete is lifted.
Polylevel is waterproof so it will never wash out and it won t degrade over time due to temperature extremes.
A simple project to raise a slab of concrete will cost less than if there is a large void under the slab requiring more material.
Find a concrete contractor.
Concrete leveling or mudjacking as it is sometimes called is a very cost efficient way to fix concrete problems.
A polylevel slab repair enables you to use the restored concrete right away.
The average cost of mudjacking or slab jacking is 511 to 1 790 or between 3 and 6 per square foot.
Ultimately the cost of raising or stabilizing concrete is a direct reflection of how much material the project will take.
In contrast the polylevel repair process can be completed in less than a day.
The primary cost variable is the specific composition of material since companies like polylevel each use their own proprietary formulas.
Down time is minimized.
The technique is used to stabilize settling foundations and repair crumbling slabs curbs and sidewalks.
Once the fresh concrete or leveling grout is placed it can take days for the repaired area to harden and cure properly so that the slab can be put back into use.
Raising a concrete sidewalk costs 300 to 600 and leveling a driveway runs 600 to 2 000.
Polylevel concrete leveling is a fast efficient and permanent solution for your damaged concrete.
It quickly expands and hardens lifting the concrete slabs above it and compressing the soil around it at the same time.
Initially polylevel flows like water filling even the smallest cracks and crevices in the soil.
Mudjacking is also referred to as slab jacking concrete raising concrete lifting or slab leveling.
The expanding polymer reaches its final strength and is ready to support weight within 15 minutes as opposed to mudjacking which takes a whole day.